Sunshine Coast University Hospital
Sunshine Coast University Hospital
Home > Projects > Sunshine Coast University Hospital
Project Details
Project Status
Completed
Project Name
Sunshine Coast University Hospital
Project Location
Birtinya
Client
Shadforth and Lend Lease
Estimated Value
$2.1M (SDC's Contribution)
Brief
SDC Group was proud to be a contractor during the construction of the Sunshine Coast University Hospital and Australia’s largest greenfield health development.
Built on a 20-hectare greenfield site at Kawana, the tertiary teaching hospital services the Sunshine Coast region, as the hub in an integrated network of accessible healthcare.
“The scale of the project is difficult to comprehend; the facility comprises a total area of 400,000 sq.m. – the equivalent of about 100 football fields” said Adrian Jenkins, Major Projects Director, Aurecon. “It has been designed to connect with and enhance the local community through its accessibility and role as a place of healing in a natural setting”.
The hospital opend in 2017 with 450 beds and has been designed for future expansion with an anticipated 738 beds by 2021.
Built on a 20-hectare greenfield site at Kawana, the tertiary teaching hospital services the Sunshine Coast region, as the hub in an integrated network of accessible healthcare.
“The scale of the project is difficult to comprehend; the facility comprises a total area of 400,000 sq.m. – the equivalent of about 100 football fields” said Adrian Jenkins, Major Projects Director, Aurecon. “It has been designed to connect with and enhance the local community through its accessibility and role as a place of healing in a natural setting”.
The hospital opend in 2017 with 450 beds and has been designed for future expansion with an anticipated 738 beds by 2021.
Interested?
Have a Project you would like
SDC Group To Tackle for you?
We’ll contact you, it’s that easy!
All you have to do is fill out the contact form, we’ll review and get back to you with 48 working hours.
All you have to do is fill out the contact form, we’ll review and get back to you with 48 working hours.